Use case

Cloud migration in hours, not months.

Most cloud migration plans are six months long because the data move is the bottleneck. Wirekite makes the data move a coffee break — and keeps the old database current until your team is ready to cut over.

The six-month migration plan is a data problem.

Pick any enterprise cloud migration and the schedule looks the same. Months of planning. Weekend cutover windows. A team on call. A rollback plan nobody wants to execute. The reason isn't the new cloud — it's getting the data into it.

With traditional tools, a one-billion-row table takes roughly thirty hours: twenty-four to extract and load, six to catch up on the changes that happened during the load. Multiply by every table and the migration plan stops being a weekend and starts being a quarter.

Wirekite collapses the data move from days to hours and the catch-up from hours to minutes. The migration plan stops being a logistics problem.

The numbers that change the math.

~35 min
to move 1 billion rows, extract + load + catch-up
8m 56s
MySQL → Snowflake, 1 billion rows, measured
188×
faster than competing tools on Postgres → Firebolt

One pipeline. Three jobs.

Wirekite handles every phase of the migration — and the same binaries handle the cutover and the post-cutover sync.

1

Move the bytes.

Wirekite Data does the one-shot bulk extract and load, landing through each target's fastest native load path. The source and target stay decoupled, so neither one waits on the other.

2

Catch up the changes.

Wirekite Replicate streams every insert, update, and delete that happened during the bulk move — and keeps streaming until you flip traffic. Single-digit-minute lag, sustained.

3

Prove the move.

Validate compares source and target row for row and column for column — type-aware for timestamps, NUMERIC, JSON, and NULL handling. Your team flips traffic with row-level confidence, not a row-count handshake.

One billion rows. Two timelines.

Capability Traditional tools Wirekite
Extract + load, 1 billion rows ~24 hours~30 minutes
Catch up on changes during the load ~6 hours~5 minutes
Total before cutover ~30 hours~35 minutes
Cutover posture Weekend window, team on callCoffee break, nobody on call
Proof of correctness Row countEvery row validated

Stop planning around your data move.

Book a 30-minute demo. We'll run a 1 billion-row migration into the cloud database of your choice, live.